LEADER IN oem EQUIPMENT PRODUCT DESIGN BACKed BY PATENTS It's your COMPANY'S FUTURe
LEADER IN oem EQUIPMENT PRODUCT DESIGN BACKed BY PATENTS It's your COMPANY'S FUTURe
1 The Kelowna BC Canadian 800 scfm RNG project drawings, Bill of Material, Operating software (Source Code), complete Mechanical//Electrical/piping/conduit drawing, project HAZOP review documentation, start-up log, Manufacturing details and drawings and much more, all built to CSA approved standards. Using Patented Technology and seen in pictures below. - Each plant section is a ready to build product for OEM builders!
2. The DeKalb, Atlanta Ga. 1200 scfm RNG project drawings, Bill of Material, Operating software (Source Code), Mechanical//Electrical/piping/conduit, Manufacturing details and drawings and much more, all built to USA approved standards. Using Patented Technology and seen in pictures below. Each plant section is a ready to build product for OEM builders!
3. The South Hills Landfill, South Park PA. RNG project drawings, Bill of Material, Operating software (Source Code), drawings, Manufacturing details and much more, built to USA approved standards. Using Patented Technology and seen in pictures below. Each plant section is a ready to build product for OEM builders!
4 & 5. Monroeville and Valley Landfill, Western PA. RNG project is owned by Montauk Renewables; with the source code software being owned by ARC and is packaged in this IP offering; ARC authored the software, commissioned and ran the two membrane type RNG plants for years. A Montauk’s plant is pictured below. Each plant section is a ready to build product for OEM builders!
6. ARC's Co2 Carbon capture and sequestration/storage (CCS) Unit is an addon process for capturing carbon dioxide (CO₂) from ARC's core gas processing plants/units; so that it is not emitted into the atmosphere. A detailed design of compression, liquefaction and site storage of (2) 80 ton daytanks which used the liquid CO2 as a greenhouse grow enhancer but the day tank storage could be use for other uses or final sequestration. Each plant section is a ready to build product for OEM builders!
7. And all other products shown on out Controlledgas.com Website!
Owning a IP license to any of the equipment shown herein could enable a OEM company to participate in the lucrative Renewable Energy market having Zero emissions technology, enabling the capturing of all methane and CO2 form the environment.
Kelowna BC Canada project owner FortisBC
DeKalb, Atlanta Ga. RNG project County owned project
South Hills Landfill, South Park PA. RNG project
Monroeville and Valley Landfill, Western PA. RNG project owned by Montauk